Also on the rise: First Solar joins Enphase and SolarEdge on the S&P 500 Index. A solar-powered camper boat. And more.
Tempe, Arizona-based First Solar is planning 10 GWdc of new solar module manufacturing capacity in Ohio and Alabama by 2025.
Also on the rise: American Battery Factory chooses Tucson as the place for giga-plant. Biden admin wants to shore up resiliency with solar-plus-storage in Puerto Rico. And more.
Analysts study lab-to-market pathways for clean energy technologies including a look at the development of First Solar’s cadmium-telluride thin film solar modules.
The digital transformation of scalable and cost-effective solar manufacturing is key to enabling the anticipated growth in clean energy alternatives.
The Rabbitbrush Solar Facility includes a 20 MW, 50 MWh battery energy storage system.
National Grid Renewables achieved commercial operations for the 275 MW solar, 125 MWh energy storage Noble Solar project.
Also on the rise: Database of North American lithium-ion suppliers. Solar sidewalk pilot project in Tampa. And more.
Intersect Power expected to be the largest buyer and operator of First Solar technology by 2029.
The company plans to invest approximately $1.1 billion in a 3.5 GW manufacturing facility to be commissioned by 2025.
Welcome to pv magazine USA. This site uses cookies. Read our policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.