Skip to content

PJM

199,000 job-years await PJM approval of 167 GW of solar, storage and wind

Trade group ACORE recommended long-distance, high-voltage transmission within the PJM grid region along with other, faster measures to help the grid operator approve 167 GW of pending solar, storage and wind projects.

Clearway, Enel executives propose three ways to fix utility-scale interconnection

Systematic transmission planning within grid regions, a “connect and manage” approach to interconnection, and using automation in interconnection studies were key solutions that could make interconnection faster and lower-cost, two leaders of renewables development firms said on a webinar.

Sunrise brief: Polar Racking adds two U.S. solar mount manufacturing facilities 

Also on the rise: Automated solar permitting speeds approval process. PJM’s pace of interconnection will not meet demand through 2028, says NRDC. And more.

PJM’s pace of interconnection will not meet demand through 2028, says NRDC

States in the PJM market with renewable portfolio standard targets will “barely” be able to meet those targets through 2027, the environmental group NRDC said, while the region will consistently fall short of an estimated renewables potential.

Interconnection delays threaten more companies each year, says GridStor VP

A GridStor VP challenged recent interconnection proposals by three grid operators, and the slow pace of federal regulators, while suggesting a $1 billion gift to grid operators to hire staff, and a digital twin of the nation’s grid to speed interconnection studies.

1

Sunrise brief: Volatile electricity markets should give solar financial modelers pause

Also on the rise: Silfab Solar raises $125 million for U.S. cell and module manufacturing. Tariff investigation, equipment detainments lead to 16% drop in new solar capacity in 2022. And more.

PJM projects 48 to 94 GW of renewables will be built in the grid region by 2030

The grid operator’s projected 5% “completion rate” for projects in its interconnection queue was questioned by executives at the renewables trade group ACORE and the consultancy GridLab.

ERCOT advanced 15 GW of solar in 2022, moving 5x faster than other RTOs/ISOs

Texas grid operator ERCOT advanced interconnection requests for 15 GW of solar projects last year, with three other grid operators advancing 9 GW. CAISO completed phase 1 studies for a large cluster of projects, while PJM and ISO-NE stayed mum on their progress.

2

Utility-scale solar opportunities and risks in a post IRA environment

The Inflation Reduction Act of 2022 is not an eat-all-you-can feast for developers.

3

US renewable PPA price hikes cool off as material costs fall

An Edison Energy report shows prices increased more moderately (4%) in Q4 2022, as compared to the steep price hikes experienced since 2021.

Welcome to pv magazine USA. This site uses cookies. Read our policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close