Skip to content

Puerto Rico

PREPA supercharges solar and storage in new long-term plan

Puerto Rico’s utility has revised its long-term plan to account for the island territory’s new 100% renewable electricity mandate. However, many details look the same – including a lack of interest in utilizing distributed generation to meet reliability needs.

1

Clean energy in Opportunity Zones: An interview with Jon Bonanno

In this interview with pv magazine, New Energy Nexus CXO Jon Bonanno describes the significant opportunity presented by the federal Opportunity Zone program – and the limited window of time to take full advantage of the program.

Puerto Rico goes 100% renewable as Trump Administration calls for more gas

Governor Rosselló has signed legislation moving the island to 100% renewable energy, while both the Trump Administration and the island’s utility push for a greater dependence on gas.

6

It’s official: Chicago will go 100% renewable

The City Council has approved Mayor Emanuel’s plan to transition the entire city’s electricity supply to renewable energy by 2035, which makes Chicago the largest U.S. city to set a 100% renewable energy commitment.

PREPA’s long-term plan is in chaos

Puerto Rico regulators have rejected the Integrated Resource Plan filed by the island’s utility; however the plan is also likely out of compliance with the island’s new 100% renewable energy law. In the interim, PREPA is moving to get gas plants online.

2

Puerto Rico to officially go 100% renewable

Senate Bill 1121 has been given final approval by the Puerto Rico legislature and is headed to the desk of Governor Ricardo Rosselló. When passed, it will make the island the fifth state-level jurisdiction to establish a 100% zero-carbon and/or renewable energy mandate.

5

Puerto Rico is on its way to 100% renewable electricity

A bill to mandate that the island’s electric system move to 100% renewable energy by 2050 has passed the Puerto Rico Senate and is being sent to the House for reconciliation, the last stop before it is expected to be signed by Governor Rosselló.

7

Puerto Rico plans stop short of the grid of the future

PREPA’s draft IRP calls for rapid deployment of solar and batteries, including the installation of as much battery storage as is currently online in the entire United States over the next four years, in a system broken up into “minigrids”. However, it stops short of utilizing behind-the-meter PV and storage.

3

As utilities fight distributed generation, electricity is getting less reliable

One of the best tools that would allow utilities to meet their central stated mission of providing a stable electricity supply is one they are fighting the hardest.

5

Puerto Rico utility favors LNG over solar in Siemens plan

The Puerto Rico utility’s favored generation plan, in a report prepared by Siemens, involves an LNG terminal at San Juan and would achieve only 55% renewables by 2038. A scenario without LNG would reach 79% renewables by 2038 at comparable cost, based on undisclosed cost assumptions.

Welcome to pv magazine USA. This site uses cookies. Read our policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close