A 4.3 MW solar project will power the company’s on-site production facility, with excess going to the state.
Management sees NEM 3.0 changes as a net positive for California and expects strong demand for solar-plus-storage in coming quarters, with installers likely taking another four months of training for integrated systems.
Partnership will expand business’ access to Yotta Energy’s energy storage solutions with solar loan financing backed by Sunstone Credit.
Also on the rise: Best practices in installing power optimizer MLPE systems. Growatt generator for portable, off-grid use. And more.
Three tips to help optimize commercial solar installations.
Net energy metering 3.0 will soon take effect, cutting payments for solar. SolarEdge’s solution of DC-coupled batteries offers a way to self-consume and protect power.
The Longroad Energy’s 108 MW Foxhound Solar Project to be acquired by Dominion Energy was the first utility-scale solar project to receive Virginia Pollinator-Smart biodiversity certification.
The residential solutions company introduced an optimizer model that can be paired to two solar panels.
pv magazine USA’s recap of notable upstream solar, integrated solar, finance and rooftop installers that reported fourth quarter or fiscal year earnings over the last week.
Located along the Blue Ridge Mountains, the scenic project marks the developer’s first project developed in Virginia, expanding DSD’s footprint into 23 states. The project will meet 85% of the community’s energy needs and produce 2,396 MWh of clean energy each year, the equivalent of 330 homes.
Welcome to pv magazine USA. This site uses cookies. Read our policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.