Skip to content

Terrasmart

Maine’s new solar facilities feature agrivoltaics, U.S.-made racking

Two agrivoltaic solar facilities in Maine will provide the state with low-cost energy while bolstering the local agricultural industry.

Sunrise brief: State solar policy increasingly moving away from traditional net metering

Also on the rise: The rise of transferable tax credits in clean energy finance. Wood Mackenzie predicts global solar growth will stagnate in 2025. And more.

Solar panel, racking integration positioned to fulfill domestic content requirements

First Solar and Terrasmart expect U.S. developers will secure the 10% domestic content bonus credit with the companies’ racking and module integration.

Sunrise brief: Maxeon Solar reports $179 million Q3 loss

Also on the rise: Fully electric, net-zero Wisconsin school powered by a microgrid. Largest solar and energy storage project in U.S. achieves regulatory approval. And more.

The frost heave challenge in solar installations

A Terrasmart Innovation Engineer looks at ways of overcoming weather challenges particular to the installing solar in Midwest states.

Cincinnati Zoo completes 2.8 MW solar carport

Terrasmart has designed and manufactured a racking system for a 2.8 MW solar carport project at Ohio’s Cincinnati Zoo and Botanical Gardens. The site’s owners claim it is the largest publicly accessible solar array in the United States, providing shade for up to 800 vehicles.

Sunrise brief: Utilities plan hydrogen power projects that crowd out renewables

Also on the rise: Canadian Solar drops 15% post Q2 earnings report. Report shows U.S. states and utilities easing into EVs. And more.

Terrasmart trackers now with hail stow feature

Terrasmart reports that the hail mitigation system uses cloud-based monitoring to automatically trigger optimum stow position to protect solar assets without requiring operator intervention.

Sunrise brief: Form Energy iron-air battery in Maine granted $147 million

Also on the rise: Sage Geosystems begins construction of 3 MW geothermal storage facility for ERCOT grid. What to look for in tracker monitoring technology. And more.

What to look for in tracker monitoring technology

Software can boost production and mitigate risks

Welcome to pv magazine USA. This site uses cookies. Read our policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close