Skip to content

NREL

Do Montanans dream of affordable electric buses, EDF and Shell sign a substantial contract: pvMB 12/5/19

Hello wonderful people and welcome to your Thursday pvMB. today we’ve got Savion’s 8 GW project pipeline, Mrs. Butterworth going solar, 3 MW coming to Virginia schools from Standard Solar and more!

Tell the kids, that 50% solar powered future of ours, it’s going to work just fine – NREL says so!

National Renewable Energy Lab researchers hourly modeled the whole of the United States, and when more than half of all electricity is coming from solar power, there would be no technical deal killers, but many spring days with free electricity that we would have to learn to use, and a need to financially recognize the predictability and grid stabilizing attributes of solar and storage.

2

Hardware brief: Minimalist racking, optimized car charging, a 10 GWh/year battery factory & more!

Got new hardware tips? Send them to USA-Editors@pv-magazine.com. Mono-PERC module pricing is still nudging downward, Energy Toolbase has integrated Chint energy storage solutions into its software, and Jinko has a new module.

Making fudge with the smartest people on earth

NREL opened the doors as scientists spoke of advancing perovskites with fundamental research, fast drying solar inks, refining solar windows, and actively pushing into high speed, high volume manufacturing capacity on the multi-terawatt scale.

1

Current wireless technology may be adequate for communicating with distributed solar and storage

A study advised by seven electric utilities found that current “long-term evolution” (LTE) wireless broadband technology may be adequate for sending signals to control, or guide, the operations of distributed solar and storage resources.

1

You too can model solar, wind and storage deployment

NREL has made its capacity planning model freely available for anyone to use. The model can optimize the amounts of solar, wind and storage to be added to the U.S. electric grid. Documentation is included, but a powerful computer and additional software are required.

The Open PV Project goes offline

The U.S. Department of Energy has shut down the site for its Open PV Project, which supplied cost and installation data. Is this the winding down of a project whose time had come, or part of a more disturbing trend?

2

Is the Trump Administration blocking the science on a renewable-powered future?

A study on reaching high levels of renewable energy has been removed from the NOAA website, and an energy writer says that the release of another study has been blocked.

7

Yotta gotta lotta $$, module pricing down, insurance for C&I, SMA’s 4.6 MW inverter, more!

As SPI approaches and hardware announcements speed up – we’ll work to keep you up! NREL speeds up ultra-efficiency solar cell manufacturing, SolaRack has a new rooftop attachment seal technique – and it uses 18% less product , APA Solar Racking’s Titan system doing well this year, more!

No climate debate at the DNC, NREL/First Solar improve thin-film cells: pvMB 8/23/19

Happy Friday one and all and welcome to today’s pvMB. Today we’ve got the Detroit Zoo going renewable, LONGi achieves AA bankability and community solar coming to Maryland. Let’s ride!

Welcome to pv magazine USA. This site uses cookies. Read our policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close