Sun Streams 3, a 285 MWdc solar plus 215 MWac / 860 MWh storage project located in Maricopa County, Arizona is expected to begin commercial operation in 2024.
Generating 224 MWac / 310 MWdc of solar energy, or enough to power approximately 94,000 homes, the project features 448 MWh of co-located storage.
Arche Solar is the first of BP’s fully-owned solar projects to begin construction, while previous projects were developed by 50:50 joint venture Lightsource BP.
The Southeast-focused solar developer is on track to cap a $1 billion full-year equity raise with a $225 million round over the next quarter.
In 2022, as supply chain challenges persisted, utility solar projects in development grew in size and energy storage is connected to half of them.
Also on the rise: First Solar joins Enphase and SolarEdge on the S&P 500 Index. A solar-powered camper boat. And more.
Tempe, Arizona-based First Solar is planning 10 GWdc of new solar module manufacturing capacity in Ohio and Alabama by 2025.
Also on the rise: American Battery Factory chooses Tucson as the place for giga-plant. Biden admin wants to shore up resiliency with solar-plus-storage in Puerto Rico. And more.
Analysts study lab-to-market pathways for clean energy technologies including a look at the development of First Solar’s cadmium-telluride thin film solar modules.
The digital transformation of scalable and cost-effective solar manufacturing is key to enabling the anticipated growth in clean energy alternatives.
Welcome to pv magazine USA. This site uses cookies. Read our policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.