The airport will buy electricity via 25-year power purchase agreements that are expected to save it $3 million over the term.
Also on the rise: Texas is urged once again to winterize its energy infrastructure, and work starts on an 80 MW BTM solar array.
The array will supply energy to a steel mill in Texas and is expected to reach commercial operation by the summer of 2023.
Also on the rise: SEIA warns that tariffs could put 18 GW of projects at risk, our ‘how long does it last?’ series takes a look at residential storage batteries, and toy wagon maker Radio Flyer goes solar.
Kid’s wagon maker Radio Flyer commissioned Chicago-based Sunvest to build the array, which was optimized with SolarEdge inverters.
The 1 MW solar-powered chargers will deliver 320 miles of range to a Class 8, 80,000 pound truck in 30 minutes.
Price increases, supply chain disruptions, and a series of trade risks are threatening the U.S.’s ability to decarbonize the grid, warned SEIA president and CEO Abigail Ross Hopper.
The projects span seven states and total 38.3 MW in capacity.
The Sirius energy management system will power commercial buildings with the greenest or cheapest electricity source possible automatically, while storing energy surpluses in EVs or battery walls to combat generation/demand imbalance.
The companies, led by SEIA, lay out six policy actions deemed necessary to grow the industry to the size needed to fight climate change and realize clean energy goals.
Welcome to pv magazine USA. This site uses cookies. Read our policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.