Construction has begun on a 260 MW/1 GWh battery energy storage system (BESS) in the state of Georgia. Burns & McDonnell has been contracted to build the battery which is scheduled for completion in 2027.
The American Clean Power Association reports a record-breaking year for utility-scale solar and storage, though a 27% drop in power purchase agreements flashes a warning light for the 2028-2030 outlook.
As AI data center growth tightens the U.S. grid, investors are pivoting toward de-risked, late-stage solar-plus-storage portfolios to secure firm capacity in a higher-rate environment, said a report from Deloitte.
Demand for gas turbines has never been higher, with an anticipated spike in future energy demand filling order books for years to come. Complex engineering makes expanding manufacturing capacity tough, but can solar and energy storage plug the gaps left by gas?
DNV’s Energy Transition Outlook 2025 report also predicts that distributed generation solar should begin outpacing utility-scale installations in some parts of the world by 2060. It adds that the levelized cost of electricity for solar is beginning to plateau and is expected to slow to an annual drop below 1% by the 2050s.
The clean energy developer and long-term asset owner acquired NextEra’s portfolio of operating solar and energy storage assets, a pipeline of projects across 25 states and brought in a team of NextEra professionals.
The independence of the ERCOT market is driving Texas’s energy transition, and pushing ahead solar-plus-storage the new gold standard. However, capitalizing on this trend requires developers to master the state’s volatile market by understanding locational pricing and smart battery operations rather than just bolting technology together.
A BASF industrial facility that produces raw materials for diapers, fertilizers, food packaging carpets and more is now powered by a 72 MW solar project with onsite energy storage.
The Eland project will deliver about 7% of Los Angeles’s electricity.
DSD Renewables and Baker Electric completed a solar-plus-storage project on the sports facility, home of the San Diego Sockers and San Diego Clippers.
Welcome to pv magazine USA. This site uses cookies. Read our policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.