The 200 MWh Fort Duncan energy storage project currently under construction is expected to be operational by summer 2025 in ERCOT territory.
If all of the RFPs, applications and other utility proposals that were active at the end of 2024 are filled, utilities will add over 18.5 GW of energy storage capacity.
Deutsche Bank and Nuveen Energy Infrastructure Credit partnered on upsizing the credit facility to support a 3.5 GW community solar pipeline in thirteen states.
Partnering with Amalgamated Bank, the independent power producer plans to develop a total of 25.5 MW in three counties in northwest New York state.
According to a Wood Mackenzie report, data centers developed since 2023 exceeded 92 GW of capacity at the end of 2024.
Each project will use 4-hour Tesla Megapack lithium ion batteries located adjacent to four operating solar power plants.
SolarAPP+, OpenSolar reports that the likelihood of projects passing inspection increases nearly 30% over traditionally permitted projects.
A report by American Clean Power Association calls for improved energy efficiency, an all-of-the-above strategy and rapid policy reform that will address interconnection and permitting delays.
TVA is accepting proposals from qualified integrators and providers to design, engineer, build, operate, and maintain a battery energy storage system in Roane County, Tennessee.
Paul Mathews named as president and CEO of this struggling residential solar energy company, as it repositions to improve cash flow.
Welcome to pv magazine USA. This site uses cookies. Read our policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.