From pv magazine global
The hot brine in a vast underground reserve under the Salton Sea in California probably contains enough lithium to build 375 million batteries for electric vehicles (EVs), according to “Characterizing the Geothermal Lithium Resource at the Salton Sea,” a new report by the US Department of Energy’s Lawrence Berkeley National Laboratory. The researchers attempted to thoroughly quantify the amount of lithium that the deep subsurface geothermal reservoir of the lake could contain.
The study also notes the advantage that this type of lithium extraction is accompanied by the production of geothermal energy, which combines the production of renewable energy with the generation of materials to promote the development of electric vehicles.
“This is one of the largest lithium brine deposits in the world,” said Michael McKibben, a geochemistry professor at the University of California, Riverside, and one of the report’s 22 authors. “This could make the United States completely self-sufficient in lithium and stop importing it through China.”
The Salton Sea Geothermal Resource Area currently has approximately 400 MW of geothermal generation capacity installed, and is estimated to have the potential for up to 2,950 MW. It is estimated that the currently proposed geothermal energy and lithium recovery operations would require around 3% of the historically available water in the region.
The land beneath the Salton Sea is owned by three entities: the federal government, the Imperial Irrigation District of California and the Cahuilla Indians of the Torres Martínez Desert.
In January 2023, electric vehicle battery maker Statevolt acquired 135 acres in Imperial Valley, California, near the Salton Sea, where it plans to build a 54 GWh lithium-ion battery gigafactory, capable of producing enough batteries to power 650,000 electric vehicles per year.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.
By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.
Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.
You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.
Further information on data privacy can be found in our Data Protection Policy.