Federal regulators should consider specific reforms to improve transmission planning, lower interconnection costs and provide cost certainty, says a group affiliated with the Solar Energy Industries Association.
Replacing existing transmission lines, known as conductors, with advanced conductors could enable 764 GW of transmission-connected solar by 2035 even if transmission in new corridors was limited, found a study by UC Berkeley and GridLab researchers.
Advanced conductors and energy storage are among the technologies that have substantial potential to increase transmission capacity, says a Department of Energy “liftoff” report.
To speed interconnection of utility-scale renewables and storage projects, a U.S. Department of Energy roadmap sets forth 35 solutions and proposes actions to implement the solutions. The roadmap was developed through a DOE stakeholder process known as i2X.
Puerto Rico led the nation in per-capita residential solar installations last year, but continued progress is threatened because a law extending solar net metering through 2031 has been challenged by a federal oversight board.
The wait for transmission interconnection studies constitutes a “major bottleneck” for solar, storage and wind projects, which accounted for over 95% of all active capacity awaiting studies at the end of 2023, Lawrence Berkeley National Laboratory has reported.
TVA decided not to choose solar and storage despite 15 GW of such projects in its interconnection queue. TVA’s board of directors could overturn the gas plant decision, said an environmental law group spokesperson.
Distributed solar and storage, along with demand response, “perform during extreme weather events” and deserve a greater role in reliability planning, the law professors say, while a new public office of grid reliability could guide transmission planning.
A modeled commercial-scale project storing energy in heated sand could produce 135 MW of power for five days. The U.S. Department of Energy is funding a pilot project intended to demonstrate commercial viability.
Some rural electric cooperative utilities allow customers to pay off energy efficiency improvement loans through their utility bills. That contributes to energy efficiency’s role in the renewables transition.
Welcome to pv magazine USA. This site uses cookies. Read our policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.