It’s the first residential inverter to achieve UL 1741 SA (Supplement A) listing, which has been mandated by California and Hawaii for compliance in September 2017.
Solaria has announced it second regional solar distributor, Fortune Energy, a wholesale supplier of renewable energy products based in Sacramento, with additional offices in Southern California, Massachusetts and Hawaii.
Exosun has unveiled a PV panel cleaning robot that offers a waterless “desert-proof, scalable and plug & play solution for effortless and fast module cleaning.”
Isolux Corsan is installing the first utility scale PV plant on the Navajo Reservation at Kayenta, AZ, a 38 MW-DC plant worth over $50 million.
The Coalition for Community Solar Access (CCSA) has now added nine new members: Borrego Solar, Distributed Sun, EWT, AES Distributed Energy, Westwood Professional Services, Relay Power, Lever Energy Finance, Solstice and GRID Alternatives. Solstice and GRID Alternatives are also CCSA’s first non-profit members.
Sun Action announced that it has begun offering re-engineered models of its PST-2AL Dual Axis Solar Tracker that will sport reduced array fields of 20 to 25 modules, compared with 42 modules in the original design.
Distributed energy resource (DER) system provider EnSync Energy Systems will acquire DCfusion, a DC system consulting and engineering company, with plans to create another subsidiary for the former.
GameChange Solar announced that it is shipping a 96 MW PV system to a site in the “Mid-Atlantic” region that will utilize over 275,000 solar panels supported by the company’s Max-Span and Max-Span Plus pile driven systems.
Grupo Clavijo and MFV Solar have reached a merger agreement to form NCLAVE, with the financial support of Q-Growth Fund, to become “the world leader in the design, manufacture and installation of structures and trackers for the solar photovoltaic market,” the companies say.
Younicos will build a 3 MW lithium ion battery storage system for the Kodiak Electric Association (KEA) in Alaska with completion expected by August, ready for high wind season. The installation replaces a lead acid array installed in 2012.
Welcome to pv magazine USA. This site uses cookies. Read our policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.