GameChange Solar announced that a 13MW system has been installed on a Florida brownfield site. The system was a combination of the Pour-in-Place™ Ballasted Ground System and the MaxSpan™ Fast- Build Pile Driven Ground System. The project utilized over 37,000 335 watt modules, and was built by a leading nationwide EPC.
Andrew Worden, CEO of GameChange Solar, stated: “We are happy to see more solar development in the sunshine state. This site was particularly gratifying to be involved with since it repurposed a brownfield site to support clean renewable solar power.”