Skip to content

Suniva secures an additional $3 million in financing

A bankruptcy court has approved the additional loan, which should allow the main creditors of the bankrupt cell and module maker to continue their pursuit the Section 201 case.

SunPower: Any trade action should apply to everyone but us

The high-efficiency solar maker asks for Section 201 action to include First Solar’s thin film products, but to exclude its back contact crystalline silicon solar as a unique product.

3

sonnenCommunity comes to the United States

A 2,900 home planned development in Arizona will feature electricity trading between a network of PV and battery systems, as a grid-tied microgrid that will also absorb excess power at strategic times for the local grid.

6

Energy Department limits scope of coal, nuclear bailout

Under fire from a broad range of forces including the oil and gas industry, the Energy Department has limited its order for a coal and nuclear bailout to regional grid operators with energy and capacity markets.

First Solar weighs in on the Section 201 trade case

The world’s largest thin-film solar maker has sided with the petitioners, testifying to the difficulties that U.S. solar cell and module makers are experiencing and the challenges of competing with imports supported by foreign governments.

SunPower completes massive parking structure solar installation in Texas

The 8.8 MW plant covers four parking garages at Toyota’s new North America headquarters

Missed opportunity: GTM Research weighs in on the Clean Power Plan

GTM Research Solar Analyst Colin Smith argues that the pending repeal of the Clean Power Plan represents a significant loss of “upside potential”.

A resilient market: An interview with Sungrow USA CEO Steven Chan

In this interview with pv magazine from the SPI 2017 trade show, Sungrow USA CEO Steven Chan talks about his company’s explosive growth in the United States, and why he sees this market as resilient.

Edisun puts online the world’s largest rooftop tracking system

The 1 MW project is being followed by a 20 MW pipeline of C&I rooftop projects, all of which will utilize dual-axis tracking.

Montana brings PURPA contract lengths back to 15 years for small projects

State regulators have increased contract lengths for projects up to 3 MW, but most of the changes made when they gutted PURPA last summer remain.

Welcome to pv magazine USA. This site uses cookies. Read our policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close