The 52 MW-AC Sumrall 2 project follows another 52 MW-AC project in the same small town that went online last December.
As renewable energy breaks new output records in California, both the need for and availability of gas in California have declined.
The Arizona utility has signed a 20-year contract to buy electricity from a 100 MW plant at this new record low price.
The company has given WARN Act notices to all of its employees, and says that it is trying to determine the right size going forward.
The company will be exhibiting the forecasting tool, which will provide on-demand forecasts of select power markets with hourly resolution, later this month in Anaheim.
Imperial Irrigation District says its use of a battery system to restart a combined-cycle gas turbine is the first such “black start” use of a battery in the United States.
The private renewable energy asset owner has bought the 156 MW-DC Comanche PV project in Pueblo County, bringing it to 543 MW-AC of solar.
The Republican senator from Iowa has stepped in to the debate, expressing concerns about the study’s credibility and whether or not its conclusion has been pre-determined.
The power company has bought the 180 MW Upton County Solar 2 project in West Texas, and signed a contract to have the project built.
A new report series from NCCETC takes a look at the increasing state-level policy activity around getting U.S. grids ready for a clean energy future.
Welcome to pv magazine USA. This site uses cookies. Read our policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.